Carrier tariffs · DEM/DET · Vietnam
Vietnam demurrage and detention free time on dry imports runs from 3 to 7 days per clock across the 13 lines below. Then a 40′ box costs VND 600,000 to 1,000,000 or USD 28 to 30 a day, rising by tier. Figures from carrier tariffs, checked 11 Oct 2026.
Source: published Vietnam DEM/DET tariffs of each line, held in our tariff file with the effective date.

Demurrage (DEM) runs while the full container sits in the port after free time. Detention (DET) runs from gate-out until the empty is back at the depot the carrier names. Rates are per container per day and climb in tiers.
Some lines in Vietnam count both on one clock (combined DEM/DET). Others give separate free days for DEM and DET. The difference decides how fast you must clear customs, truck the box and return the empty.
This page puts 16 carrier tariffs side by side. It is written for forwarders, consignees and EPC buyers who need to budget an import or export through Cat Lai, Cai Mep, Hai Phong or Da Nang. Below: the three places free time disappears fastest (customs inspection, OOG permits, the wrong empty depot) and what to ask the line before you book.
For THC, B/L and D/O fees, see our local charges in Vietnam by shipping line. This page covers only the clock after discharge or empty pick-up.
Import DEM/DET is paid by the consignee before the delivery order is released or the next box is collected. “First tier” is the rate on the first chargeable day; “top tier” is the highest published rate. Tiers in between are on each carrier page.
| Carrier | Clock | Free time | First tier per day (20′ / 40′) | Top tier per day (20′ / 40′) | Currency · VAT | Tariff |
|---|---|---|---|---|---|---|
| COSCO | Combined | 7 days | 15 / 30 | 25 / 50 | USD · incl. VAT | effective 01 Apr 2024 |
| Emirates | Combined | 7 days | 15 / 30 | 30 / 60 | USD · excl. VAT | effective 01 Jul 2025 |
| Evergreen | Split | DEM 5 days / DET 3 days | 300,000 / 600,000 | 600,000 / 1,200,000 | VND · excl. VAT | checked 02 Oct 2026 |
| Gold Star Line | Split | DEM 4 days / DET 3 days | 440,000 / 800,000 | 760,000 / 1,500,000 | VND · excl. VAT | effective 01 Jan 2026 |
| HMM | Split | DEM 5 working days / DET 3 working days | 480,000 / 880,000 | 2,000,000 / 2,600,000 | VND · excl. VAT | checked 02 Oct 2026 · HCMC rows |
| Maersk | Split | DEM 4 calendar days / DET 3 calendar days | 14 / 28 | 57 / 114 | USD · excl. VAT | effective 15 Mar 2025 |
| MSC | Combined | 7 calendar days | 504,000 / 882,000 | 1,260,000 / 2,897,000 | VND · incl. VAT | effective 01 Apr 2025 |
| ONE | Split | DEM 7 days / DET 3 days | 450,000 / 900,000 | 550,000 / 1,100,000 | VND · excl. VAT | effective 01 Apr 2026 |
| OOCL | Combined | 7 calendar days | 15 / 30 | 25 / 50 | USD · incl. VAT | checked 02 Oct 2026 |
| PIL | Combined | 7 days | 400,000 / 750,000 | 950,000 / 1,850,000 | VND · incl. VAT | effective 15 Apr 2023 · HCMC rows |
| TS Lines | Split | DEM 5 days / DET 3 days | 380,000 / 800,000 | 580,000 / 1,100,000 | VND · incl. VAT | effective 10 Dec 2025 · HCMC rows |
| Wan Hai | Split | DEM 5 days (DG cargo: 3 days) / DET 3 days | 500,000 / 1,000,000 | 720,000 / 1,340,000 | VND · excl. VAT | checked 02 Oct 2026 · HCMC rows |
| Yang Ming | Split | DEM 5 days / DET 3 days | 367,500 / 735,000 | 682,500 / 1,155,000 | VND · excl. VAT | effective 18 Jun 2026 |
Rates for Toàn VN (all Vietnam ports) are used where the carrier publishes them; “HCMC rows” marks lines that publish Ho Chi Minh City figures only. Dangerous goods and reefer scales are excluded here: they are shorter and dearer, so check the carrier page.
Worked example, Maersk import 40′ dry: 4 calendar days of demurrage free time, then USD 28 per day for the next 3 days and USD 46 per day from the 4th chargeable day (tariff effective 15 Mar 2025, before VAT; see the Maersk Vietnam import page). A box that stays 10 days in the terminal pays 3 × 28 + 3 × 46 = USD 222 in demurrage, before any detention or port storage.

On export, the clock starts when you pick up the empty and stops when the laden box is loaded or gated in before cut-off, depending on the line. Free time is usually longer than on import, but late cargo or a rolled booking can use it up.
| Carrier | Clock | Free time | First tier per day (20′ / 40′) | Top tier per day (20′ / 40′) | Currency · VAT | Tariff |
|---|---|---|---|---|---|---|
| COSCO | DET only | DET 7 days | 20 / 40 | 25 / 50 | USD · incl. VAT | effective 12 Jan 2026 |
| Emirates | Combined | 10 days | 15 / 30 | 22 / 44 | USD · excl. VAT | effective 01 Jul 2025 |
| Evergreen | Combined | 5 days | 200,000 / 400,000 | 300,000 / 600,000 | VND · excl. VAT | checked 02 Oct 2026 |
| Gold Star Line | DEM only | DEM 7 days | 300,000 / 600,000 | 500,000 / 800,000 | VND · excl. VAT | effective 01 Jun 2025 |
| HMM | Split | DEM 7 working days / DET 6 working days | 400,000 / 650,000 | 1,000,000 / 1,500,000 | VND · excl. VAT | checked 02 Oct 2026 · HCMC rows |
| Maersk | Combined | 7 calendar days (incl. ETD) | 14 / 28 | 57 / 114 | USD · excl. VAT | effective 15 Mar 2025 |
| MSC | Combined | 7 calendar days | 394,600 / 789,000 | 654,900 / 1,310,900 | VND · incl. VAT | effective 12 Jan 2026 |
| ONE | Combined | 10 calendar days | 450,000 / 900,000 | 550,000 / 1,100,000 | VND · excl. VAT | effective 01 Apr 2026 |
| OOCL | Combined | 7 calendar days | 20 / 40 | 25 / 50 | USD · incl. VAT | checked 02 Oct 2026 |
| PIL | Combined | 8 days | 400,000 / 700,000 | 750,000 / 1,200,000 | VND · incl. VAT | effective 10 Jan 2024 · HCMC rows |
| SITC | DET only | DET 10 calendar days | 300,000 / 600,000 | 500,000 / 1,000,000 | VND · excl. VAT | checked 11 Oct 2026 |
| TS Lines | Split | DEM 5 days / DET 5 days | 380,000 / 800,000 | 580,000 / 1,100,000 | VND · incl. VAT | effective 10 Dec 2025 · HCMC rows |
| Yang Ming | Split | DEM 5 days / DET 5 days | 297,000 / 594,000 | 440,000 / 880,000 | VND · excl. VAT | effective 01 Oct 2026 |
Maersk counts export free time including the vessel ETD day. MSC and OOCL count from empty pick-up to CY cut-off. If a booking rolls to the next vessel, ask the line in writing whether the extra days are waived.
Flat rack or open top? Add L×W×H and weight. We check the road permit and lowbed before the vessel arrives, which is where most OOG free time is lost.
Special equipment is scarce, so lines protect it. On import, COSCO, Emirates, Evergreen, Gold Star Line, MSC, OOCL, PIL, Wan Hai and Yang Ming give fewer free days on flat rack and open top than on dry boxes, and COSCO, Emirates, Evergreen, Gold Star Line, MSC, OOCL, PIL, TS Lines, Wan Hai and Yang Ming charge more per day from the first tier.
| Carrier | Dry free time | FR/OT free time | Dry 40′ first tier | FR/OT 40′ first tier | Currency |
|---|---|---|---|---|---|
| COSCO | 7 days | 5 days | 30 | 80 | USD |
| Emirates | 7 days | 5 days | 30 | 70 | USD |
| Evergreen | DEM 5 days / DET 3 days | DEM 4 days / DET 3 days | 600,000 | 1,200,000 | VND |
| Gold Star Line | DEM 4 days / DET 3 days | DEM 3 days / DET 3 days | 800,000 | 2,200,000 | VND |
| Maersk | DEM 4 calendar days / DET 3 calendar days | DEM 4 calendar days / DET 3 calendar days | 28 | 28 | USD |
| MSC | 7 calendar days | 6 calendar days | 882,000 | 1,130,000 | VND |
| ONE | DEM 7 days / DET 3 days | Same as dry (one scale for all equipment) | 900,000 | same | VND |
| OOCL | 7 calendar days | 3 calendar days | 30 | 100 | USD |
| PIL | 7 days | 5 days | 750,000 | 2,300,000 | VND |
| TS Lines | DEM 5 days / DET 3 days | DEM 5 days / DET 3 days | 800,000 | 2,320,000 | VND |
| Wan Hai | DEM 5 days (DG cargo: 3 days) / DET 3 days | DEM 3 days / DET 3 days | 1,000,000 | 1,600,000 | VND |
| Yang Ming | DEM 5 days / DET 3 days | DEM 3 days / DET 3 days | 735,000 | 1,575,000 | VND |
OOG cargo also needs more time than a dry box: a road permit for oversize loads, a lowbed booking, sometimes a route survey and a crane at site. When those start after the vessel arrives, the free days are gone before the truck leaves the port.

More on the equipment itself: flat rack container dimensions and open top container guide.
Most lines publish one scale for all Vietnam ports, but not all. Our file holds port-specific DEM/DET rows for Maersk (Cai Mep), ONE (Hai Phong), Wan Hai (Cai Mep) and Wan Hai (Hai Phong).
CMA CGM and ZIM publish port storage rows in our file rather than a DEM/DET scale. Ask us for their free time on your booking. Port storage can come on top of carrier demurrage: the MSC import scale, for example, excludes port storage.
Comparing terminals? Our Cai Mep port guide and Cat Lai port guide explain which services call where and how long trucking to industrial zones takes.

Extra free days are agreed per contract or per booking. Get them printed on the booking confirmation or the service contract; an email from sales is weaker.
If the factory needs days to unload, a combined clock with long free time suits better than a split one with three DET days.
Pre-check the HS code, permits and the commercial documents. A customs inspection can take days that the free time does not stop for.
A box returned to the wrong depot is not “returned”. Detention keeps running until it reaches the depot on the delivery order.
Importing machinery? Our customs clearance guide for Vietnam lists the documents that cause most delays.
Each carrier page shows every tier, DG and reefer scales, and the THC, B/L and D/O fees we hold for that line: CMA CGM, COSCO, Emirates, Evergreen, Gold Star Line, HMM, Maersk, MSC, ONE, OOCL, PIL, SITC, TS Lines, Wan Hai, Yang Ming, ZIM.
Tony Tuan, CEO: WhatsApp +84 909 411 668 · ceo@projectshipping.vn
Nura Tu, Overseas Department: WhatsApp +84 906 770 650 · overseas@projectshipping.vn
Calling from Vietnam: 0909 411 668. We never contact your customer. Partner agents can read about us on the agents page.
Last checked against carrier tariffs: 11 Oct 2026. Effective dates are shown per carrier. Tariffs change; the carrier invoice prevails.




© 2017 – 2026 Project Shipping. Design by Thiết kế Web DC