☰ Menu

Breakbulk · Heavy lift · Ro-Ro · Vietnam

Breakbulk, Heavy Lift & Ro-Ro Shipping in Vietnam

Breakbulk and heavy lift units too big for any container, handled from ship’s hook to site by one team: lifting plan, customs, lashing and our own lowbeds.

For freight agents, EPC contractors and plant owners. · What to send us

Breakbulk shipment of crawler crane components lashed on the deck of a heavy lift vessel at sea
Breakbulk: components of two 900 t-class crawler cranes lashed on deck (2023).
245breakbulk and OOG truck moves from Tan Thuan, Ben Nghe and Lotus, Apr 2025 to Oct 2026
135 theaviest single piece we delivered to site
25–500 tmobile cranes for port and site lifts
30 mintrucking plan once we have dimensions

A breakbulk shipment fails in the gaps between companies: the vessel agent, the stevedore, the trucker and the customs broker each do their part, and nobody owns the hand-over. In Vietnam we close those gaps by running the whole chain from one desk. This page explains when breakbulk, heavy lift or Ro-Ro is the right mode, what happens at the port, and what you need to send for a firm plan.

When does breakbulk make more sense than a flat rack?

A 40′ flat rack takes most over-width machinery. Once a piece is too heavy, too long or too wide for a rack, or a project ships dozens of large units at once, breakbulk or Ro-Ro is usually safer and cheaper per ton. We compare the options on every enquiry before we quote.

Your cargoUsual modeWhy
Over-width or over-height, under about 40 tFlat rack or open topContainer vessel, frequent sailings, door delivery on a standard OOG truck
Single piece above flat rack payload (40′ racks often carry only about 40–45 t)Breakbulk or Ro-RoLifted by ship’s gear or port crane, or rolled on a Mafi trailer
Long items such as ducting, booms, girders over 13 mBreakbulkNo container length limit; stowed on deck or in the hold
Wheeled or tracked units: trucks, cranes, pumpsRo-RoDriven on board, no lifting, lower handling risk
Many large packages for one plantBreakbulk part-charterOne vessel call, one discharge plan, fewer port moves

Not sure which one fits? Our guide what is breakbulk cargo compares breakbulk, container, Ro-Ro and bulk in more detail.

Breakbulk and heavy lift services we handle in Vietnam

  • Ocean booking: liner breakbulk and part-charter on heavy lift and conventional vessels, Ro-Ro with K Line, NYK and MOL.
  • Plans before the ship: stowage, lifting and lashing plans prepared by our team, with supervision at loading and discharge.
  • Port coordination: discharge sequence, crane booking and hook-to-truck delivery where the terminal allows it.
  • Customs clearance by our own licensed agent: import, export, temporary import and re-export, project duty exemption.
  • Lashing and securing by our in-house crew, with our own lashing certificate for Mafi and breakbulk units.
  • Heavy lift equipment: mobile cranes 25–500 t, forklifts 2–25 t and SPMT for over-dimension lifts.
  • Road leg on our 6-axle and 4-axle lowbeds, with route survey, road permit and escort.
  • Barges of 2,000–5,000 t for river and coastal legs when the road cannot take the load.
40ft flat racks with excavators next to a Project Shipping lowbed at SP-ITC port
2 × 40′ flat racks with excavators, SP-ITC → Di An (September 2026).

Send the packing list with L×W×H and weight per piece. Get a mode comparison and trucking plan within 30 minutes.

Add port of loading or discharge, site address and target dates. Drawings with lifting points let us size cranes on the first reply.

Hook-to-truck breakbulk discharge: how it works

A breakbulk move costs least when the cargo never touches the quay twice. With hook-to-truck, the crane lifts each piece from the vessel straight onto our trailer. There is no storage, no second lift and no extra port handling charge.

Before arrivalConsignee sends the D/O, ETA and release documents at least 2 working days ahead. Without them our dispatcher does not send trucks.
Truck and crane bookingWe register plates, trailer type and shift with the terminal, and match the crane to the heaviest piece.
Lift and securePiece goes onto timber dunnage, our crew lashes and covers it, photos go to you.
Weigh and exitPort weighbridge confirms gross weight. It must match the road permit, or the truck stays.
Why we check the weighbridge against the permit: a permit issued for 30 t of cargo does not cover a truck carrying 44 t. At a roadside weigh station that counts as having no permit at all. We learned this once and now compare the two numbers before every heavy lift truck leaves the gate.

When the vessel discharges faster than trucks can turn, cargo goes to the yard and we collect it later. That adds yard storage and one more lift, so we plan the truck count against the discharge rate in advance.

Ro-Ro: when your heavy lift unit can roll

Ro-Ro avoids the crane altogether. Self-propelled units drive on board; static heavy pieces go on a Mafi roll trailer and are towed up the ramp. For round or heavy items the lashing plan matters more than the lift.

Ro-Ro heavy lift: cylindrical unit over 60 t lashed on a Mafi roll trailer at SPCT port Ho Chi Minh City
Industrial roll over 60 t lashed on a Mafi trailer at SPCT port before Ro-Ro loading.

Case: 61 t roll, SPCT → Shanghai

A used industrial roll, 11.0 × 1.85 × 1.8 m and 61 t, was too heavy for a flat rack. We trucked it to SPCT port under an overweight permit, rolled it onto a Mafi trailer and lashed it with chains and timber chocks placed symmetrically, because a round piece wants to roll.

The same Ro-Ro method works for transformers, generators and press frames that cannot be lifted at the berth.

We book Ro-Ro with K Line, NYK and MOL for trucks, construction machinery and rolling units across Asia and Australia. Recent jobs include 20 Scania trucks from Singapore to Hai Phong and an amusement ride system from Ho Chi Minh City to Melbourne.

Which Vietnam ports handle breakbulk and heavy lift?

Breakbulk into southern Vietnam lands mostly at the river terminals of Ho Chi Minh City and at Cai Mep–Thi Vai. Each port suits different cargo. Before we confirm a heavy lift plan, we check crane capacity at the berth, quay load limits and truck access.

Port areaCargo we often move thereWhat we check first
Tan Thuan (Ho Chi Minh City)Steel plate, coils, steel structuresNight shifts, flatbed count per shift, weighbridge
Ben Nghe (Ho Chi Minh City)Plant equipment, construction machinery, tarped packagesDischarge sequence, gate times, night routes to Dong Nai
Lotus (Ho Chi Minh City)Excavators, oversize equipmentQuay crane booking, trailer access to the berth
SPCT, Hiep PhuocRo-Ro units on Mafi trailersRamp and Mafi capacity, lashing plan
PTSC Phu My and Cai Mep terminalsHeavy lift modules, crane components, export breakbulkHeavy lift discharge plan, axle loads on access roads
Hai PhongRo-Ro vehicles, northern projectsBridge limits on provincial roads, escort

From the old District 7 port area alone, our trucks made 245 breakbulk and OOG moves in 18 months, including more than 100 flatbed runs from Tan Thuan to VSIP 3 and Nhon Trach 3. For port details see our Vietnam ports guide.

Breakbulk and heavy lift jobs we have run

Customer names are withheld; cargo, routes and dates are as recorded in our job files.

Breakbulk export: long steel ducting section lifted by quay crane at night in Vietnam

Steel ducting for an LNG project, export (Oct–Nov 2025)

Cargo
Large steel ducting sections made in Vietnam, up to about 18.6 m long and 14 t each
Route
Fabrication yard in Ho Chi Minh City → export port (one lot via Gemalink, Cai Mep) → US Gulf Coast
Our scope
Several lots of 4–6 packages trucked to the port on flatbeds and multi-axle trailers, with photos at port loading
Breakbulk packages loaded on Project Shipping lowbed at Ben Nghe port Ho Chi Minh City

Plant equipment, Ben Nghe → Dong Nai (Sept 2026)

Cargo
Tarped breakbulk packages discharged at Ben Nghe port
Equipment
2 of our lowbeds
Route
Ben Nghe port → Song May industrial zone, Dong Nai
Our scope
Port collection, lashing and night delivery to site

Larger heavy lift projects follow the same pattern. In 2023 we handled breakbulk components of two 900 t-class crawler cranes, handled at PTSC Phu My port on modular trailers and SPMT.

What drives the cost of breakbulk in Vietnam?

We do not publish fixed breakbulk rates, because two shipments of the same weight can differ by a wide margin. These are the factors that move the price, in the order they usually matter.

Cost driverWhy it mattersHow to keep it down
Freight ton (weight or volume)Breakbulk freight is charged on the higher of weight and measurementAccurate packing list; avoid oversized crates
Heaviest single liftDecides ship’s gear, port crane or floating craneSplit modules where engineering allows
Hook-to-truck or yardYard storage and a second lift add cost and daysDocuments ready 2 days before ETA
Road permit classSurvey, escort and night-only running for super-heavy loadsSend drawings early; lead time 3–30 working days
Lashing and dunnageRound, top-heavy or fragile pieces need more points and materialShare centre of gravity and lifting points
Customs regimeDuty exemption and temporary import need documents before arrivalConfirm the regime at booking

For the road leg, read our heavy haulage in Vietnam page. Permit thresholds are set by Circular 12/2025/TT-BXD, amended by Circular 19/2026/TT-BXD.

What to send for a breakbulk quote

Send what you have and we will ask for the rest. With these items we can usually confirm the mode and the road plan on the first reply.

ItemWhy we need it
Packing list: L × W × H and weight per pieceMode choice, freight tons, trailer and permit class
Drawings with lifting points and centre of gravityCrane size, spreader beams, lashing plan
Port of loading or discharge and site addressBerth, hook-to-truck option and road corridor
Cargo ready date and required on-site dateVessel options and permit timing
Incoterm and customs regimeWho books what, and documents needed before arrival

FAQ: breakbulk, heavy lift and Ro-Ro in Vietnam

Can breakbulk go straight from the vessel to the truck in Vietnam?
Often, yes. Several Ho Chi Minh City terminals allow hook-to-truck discharge for breakbulk and heavy lifts. It needs the D/O and release documents ready about 2 working days before arrival, and trucks booked for the right shift.
When should I choose Ro-Ro instead of breakbulk?
When the unit can roll: trucks, cranes and machinery on wheels or tracks drive on board. Static heavy pieces can also go Ro-Ro on a Mafi roll trailer, which avoids lifting at the berth.
Which Ro-Ro lines do you work with?
We book Ro-Ro with K Line, NYK and MOL for trucks, construction machinery and rolling units across Asia and Australia.
Do you issue lashing certificates for breakbulk cargo?
Yes. Our in-house lashing crew secures Mafi, flat rack and breakbulk units, and we issue our own lashing and securing certificate.
How heavy a piece can you move by road after discharge?
Our own 6-axle lowbed carries up to 62 t. For heavier pieces we add modular trailers and SPMT from long-term partners; the heaviest single piece we have delivered to site is 135 t.
Will you contact our end customer?
No. We work under your instructions. Photos, documents and updates go to you unless you ask us to deal with the consignee.

Related services in Vietnam

Project cargo door-to-site

One plan for vessel, port, permit and road, from one desk.

Project cargo →

Flat rack & open top

Over-width and over-height containers through Cat Lai, Cai Mep and Hai Phong.

OOG containers →

Our fleet & company

Lowbeds, networks, customs licence and the people you will deal with.

About Project Shipping →

Shipping breakbulk or heavy lift to or from Vietnam?

Tony Tuan, CEO: WhatsApp +84 909 411 668 · ceo@projectshipping.vn
Nura Tu, Overseas Department: WhatsApp +84 906 770 650 · overseas@projectshipping.vn
Calling from Vietnam: 0909 411 668

Last updated: October 2026 · Vietnamese version

Request a quote Reply within one working day · OOG trucking plan often in 30 minutes

We use your details only to answer this request. We never contact your customer.

DOWNLOAD BẢNG GIÁ