Project cargo · Door-to-site · Vietnam

Project Cargo in Vietnam: Door-to-Site Logistics

One plan for vessel, port, permit and road, run from one desk with our own lowbeds, customs agent and lashing crew.

For freight agents, EPC contractors and factories relocating equipment. · What to send us

Project cargo in Vietnam: long Liebherr crane boom loaded on a Mafi roll trailer at the port
Long crane boom on a Mafi roll trailer at the port, ready for Ro-Ro loading.
135 theaviest single piece we delivered to site
62 tpayload of our own 6-axle lowbed
3–5 daystypical permit lead time on a known route
30 mintrucking plan once we have dimensions

Most delays on project cargo in Vietnam do not happen at sea. They happen in the last 50 km: a permit that was applied for after the vessel berthed, a bridge that nobody measured, a crane booked for the wrong day. This page explains how we plan those last kilometres, how long each step takes, and what you need to send us to get a firm quote.

What counts as project cargo in Vietnam?

For road transport, Vietnamese law looks at the loaded vehicle, not the cargo alone. Under Circular 12/2025/TT-BXD, amended by Circular 19/2026/TT-BXD, a move needs an oversize or overweight road permit when the vehicle with its load exceeds any limit below.

LimitThreshold (vehicle + cargo)What it means for your shipment
Widthover 2.5 mMost over-width flat racks. Our own trucks already hold a permit for flat racks of about 3.3 m wide.
Heightover 4.2 m (4.35 m for container vehicles)Tall machinery and open top cargo. Route needs a clearance check for bridges and overhead lines.
Lengthover 20 mLong beams, crane booms, pipe racks, tower sections.
Gross weightover 48 tHeavy single pieces: presses, transformers, reactors. Axle loads and bridges must be checked.

Anything above these limits is project cargo in practice, whatever the commodity. The permit is issued by the provincial Department of Construction or the Vietnam Road Administration when the route crosses provinces. The permit names the vehicle plate, the route and the time window, so the plan has to be fixed before the application goes in.

Door-to-site project cargo scope: what we handle

  • Ocean booking: flat rack, open top, platform, breakbulk, heavy-lift and Ro-Ro, with OOG acceptance before you confirm.
  • Port handling: hook-to-truck discharge where the terminal allows it, so cargo does not sit on the quay.
  • Customs clearance by our own licensed agent: import, temporary import and re-export, project duty exemption, transit.
  • Route survey on the ground, with photos, video and the control points measured.
  • Road permits, escort and police coordination when the permit or the route requires it.
  • Lashing and securing by our crew, with our own lashing certificate.
  • Lifting: mobile cranes 25–500 t and forklifts 2–25 t for port and site.
  • Delivery to the foundation, photos at every stage, proof of delivery to you.
Project cargo: tower crane on a 40ft flat rack hauled by a Project Shipping truck at night
Tower crane on a 40′ flat rack, Cat Lai port → National Route 13, overnight (March 2026).

Send L×W×H + weight, port and site. Get a route plan and net trucking rate within 30 minutes.

Drawings with lifting points help us size cranes on the first reply. Ocean options and customs scope follow the same working day.

Our method for project cargo in Vietnam, step by step

Every heavy or oversized job runs through the same ten steps from our internal operations procedure. No step is skipped because a route “should be fine”.

Cargo technical sheetDrawing, photos, packing list, weight and centre of gravity, pick-up and delivery points.
Legal classificationIs the loaded vehicle oversize, overweight, or both? This decides permit and escort.
Desk route optionsBridge and road load data, published size limits, one or two candidate routes.
Field route surveyOur team drives the route: clearances, turning radii, overhead lines, gate widths.
Method & quoteMethod statement, cost sheet and quotation, approved by management on large jobs.
Road permitApplication with survey report, vehicle and cargo documents; permit checked line by line.
Pre-loading checkPermit, trailer, lashing gear and escort plan ready, toolbox talk with the crew.
Execute, report, closeLoading and lashing record, convoy with escort, proof of delivery, lessons logged.
Why the survey comes before the quote: a price without a surveyed route leaves out the costs that hurt most in Vietnam: night-only running, waiting for a permit, lifting an overhead line, a second crane at site. We would rather quote once and correctly.

How long does an oversize permit take for project cargo in Vietnam?

Once the application file is complete, the authority processes it in about two working days. The real lead time depends on what has to happen before the file is complete. These are the planning times we use.

Type of moveTypical lead timeWhat drives it
Simple OOG on a route we know3–5 working daysStandard file, no new survey
OOG that needs a field survey5–10 working daysSurvey report, photos and measured control points
Super-heavy, complex bridges10–20 working daysAxle load and bridge checks with the road authority
Reinforcement, several provinces, police, night moves15–30 working daysCoordination between provinces and traffic police

Send us the drawing as soon as the purchase order is signed, not when the vessel sails. That one change removes most demurrage and storage costs on project cargo in Vietnam.

From port to site: the corridors we run

Most project cargo for southern Vietnam lands at Ho Chi Minh City or Cai Mep and goes to industrial zones within a few hours’ drive. The route, not the distance, sets the price.

PortTypical destinationsWhat we check first
Cat Lai (Ho Chi Minh City)Binh Duong, Dong Nai, Long An industrial zonesCity truck curfews, flyover clearances, gate width at the terminal
Cai Mep–Thi VaiPhu My, Ba Ria–Vung Tau, Dong NaiHeavy-lift discharge plan, axle loads on access roads
River terminals: SPCT, SPITC, Ben Nghe, Lotus, Tan Thuan, Hiep PhuocHo Chi Minh City, Long An, Dong NaiHook-to-truck availability, barge option for the heaviest pieces
Hai Phong (incl. Lach Huyen)Northern industrial zonesBridge limits on provincial roads, escort requirements

Need a long-haul leg or a destination near a border? We have delivered pressure vessels from Bien Hoa to Moc Bai near the Cambodian border, and cable reels from Cat Lai to Khanh Hoa in central Vietnam. See more on our heavy haulage and OOG trucking page.

Project cargo we have moved in and out of Vietnam

A few jobs that show the range of project cargo in Vietnam we handle, inbound and outbound. Customer names are withheld at our customers’ request; routes, dates and equipment are as recorded in our job files.

Mobile crane loading a cylindrical unit onto a Project Shipping lowbed at a factory

100 t mobile crane, Ro-Ro to Korea (April 2023)

Cargo
One 100 t mobile crane
Route
Ho Chi Minh City → Korea
Method
Driven on board a Ro-Ro vessel, lashed on deck
Our scope
Ro-Ro booking and delivery to the vessel
Heat exchanger for an industrial boiler shipped in open top containers to Vietnam

Industrial boiler parts in 2 open top containers (August 2025)

Cargo
Boiler components including a heat exchanger
Equipment
2 × 40′ open top containers
Why OT
Top loading by crane for parts too tall to slide into a standard box
Our scope
Open top container shipment for the boiler package
Project cargo: 40ft flat racks with excavators next to a Project Shipping lowbed at SP-ITC port
2 × 40′ flat racks with excavators, SP-ITC → Di An (September 2026).

Why so many project moves in Vietnam run at night

Ho Chi Minh City and several provinces restrict heavy trucks in daytime on urban roads, and a slow convoy is safer when traffic is light. A night move needs the permit window, the escort and the receiving site all aligned, so we confirm the site’s receiving hours before we book the convoy.

Our crews send photos at loading, after lashing and on arrival, so you can update your customer without waiting for the morning.

Industries we move project cargo for

Most project cargo in Vietnam comes from three sectors, each with its own typical pieces and risks.

Power & energy

Transformers, boilers, heat exchangers, wind turbine parts, cable reels for grid projects.

Factory relocation & FDI plants

Presses, production lines, tanks and pressure vessels moving into Vietnamese industrial zones.

Construction & cranes

Mobile and tower cranes, crawler crane components, steel structures and bridge sections.

What to send for a project cargo quote in Vietnam

Send what you have; we will ask for the rest. With these items we can usually give a firm trucking plan on the first reply.

ItemWhy we need it
L × W × H and weight per pieceDecides trailer, permit class and escort
Drawing with lifting points and centre of gravitySizes cranes and lashing; avoids a second lift
Port of discharge or pick-up, and site addressLets us pick the corridor and check gates
Ready date and required delivery dateSets permit timing and night-move windows
Incoterm and customs regime (normal, temporary import, duty exemption)Defines who files what, and the documents needed before arrival
Site conditions: crane access, ground, receiving hoursAvoids surprises on the last 100 m

FAQ: project cargo in Vietnam

Do I need a permit for a 40′ flat rack that is 3.2 m wide?
Yes. Any loaded vehicle over 2.5 m wide needs an oversize permit in Vietnam. Our own trucks already hold a permit for over-width flat racks of about 3.3 m, so there is no permit wait for that width on our trucks.
How early should we start the permit process?
As soon as you have a drawing and a delivery address. Plan 3–5 working days on a known route, 5–10 working days when a field survey is needed, and longer for super-heavy or multi-province moves.
Can project cargo go straight from the vessel to the truck?
Often, yes. Several Ho Chi Minh City terminals allow hook-to-truck discharge for breakbulk and heavy lifts. We confirm it with the terminal during planning; it saves storage and a second lift.
Can you clear project cargo under duty exemption or temporary import?
Yes. Our in-house licensed customs agent handles import, temporary import and re-export, transit and project duty exemption. Send the contract and packing list and we list the documents needed before arrival.
Do you own the trucks for project cargo?
We own a 6-axle lowbed with a 14.5 m deck and up to 62 t payload, and two 4-axle lowbeds. For larger moves we add modular trailers, SPMT and cranes from long-term partners, and we tell you upfront which equipment is our own.
Will you contact our end customer?
No. We work under your instructions. Photos, documents and updates go to you unless you ask us to deal with the consignee.

Related services for OOG and project cargo in Vietnam

Flat rack & open top

Over-width and over-height containers through Cat Lai, Cai Mep and Hai Phong.

OOG containers →

Breakbulk & heavy lift

Units too large for any container, discharged hook-to-truck where possible.

Breakbulk →

Our fleet & company

Lowbeds, networks, customs licence and the people you will deal with.

About Project Shipping →

Planning project cargo into Vietnam this quarter?

Tony Tuan, CEO: WhatsApp +84 909 411 668 · ceo@projectshipping.vn
Nura Tu, Overseas Department: WhatsApp +84 906 770 650 · overseas@projectshipping.vn
Calling from Vietnam: 0909 411 668

Last updated: October 2026 · Vietnamese version

Request a quote Reply within one working day · OOG trucking plan often in 30 minutes

We use your details only to answer this request. We never contact your customer.