☰ Menu

WCA Projects · OPCA Gold · Vietnam origin, destination and cross-trade

Global Project Forwarding Network: Your Vietnam Partner in WCA Projects and OPCA

A project forwarding network only works if the member at each end owns the hard part. In Vietnam we own it: customs, oversize permits and our own lowbeds up to 62 t, for agents who keep their customer. Members of WCA Projects (ID 135393) and OPCA Gold (ID 75121659).

For network members, overseas forwarders and EPC logistics teams. · Cross-trade set-ups

Project Shipping prime mover and lowbed trailer marked PROJECT SHIPPING, the Vietnam end of a project forwarding network
Our own prime mover and lowbed with a 40′ box, Ho Chi Minh City area, 2026. The trailer carries our name and hotline.
580+shipments handled March to September 2026
45+ countrieswhere we already work with agents
135 theaviest single piece delivered
2 hoursroute plan and net rate within working hours once we have dimensions
WCA incl. WCA Projects · ID 135393 OPCA Gold · ID 75121659 Licensed customs agent · Decision 247/QĐ-TCHQ Head office · Ho Chi Minh City

Project cargo goes wrong at the ends, not on the ocean. The transformer waits at the quay because the road permit was never filed. The flat rack sits in the yard because the local agent quoted trucking and then looked for a truck.

If you are a WCA Projects or OPCA member with a job touching Vietnam, this page tells you what we do ourselves, what we subcontract, and how we handle cross-trade so your customer stays yours.

Below: the role split for each task, the four cross-trade set-ups we see, how we vet the other end, a real forwarder job from March 2026, our fleet limits, and the questions agents ask before they nominate a Vietnam member.

What does a Vietnam member of a project forwarding network actually do?

In a project forwarding network, each member owns its country. For Vietnam that means four jobs that cannot be done from abroad: customs, port handling, oversize road permits and heavy trucking to site.

TaskWho does itOur own team or partner
Ocean booking (flat rack, open top, breakbulk, Ro-Ro)You, or us on requestBooked with carriers; we check OOG acceptance on the Vietnam side
Customs clearance, temporary import, project duty exemptionUsOwn licensed customs desk (Decision 247/QĐ-TCHQ)
Route survey and oversize permitsUsOwn team; police escort arranged when the permit requires it
Heavy truckingUsOwn 6-axle lowbed and two 4-axle lowbeds; partner modular trailers above that
Cranes and SPMTUs, as coordinatorPartner equipment: mobile cranes 25–500 t, SPMT
Contact with the consigneeYou decideOnly on your instruction

In a project forwarding network, we say upfront which equipment is ours and which is hired. That matters when a schedule slips: our own trucks move on our call, partner cranes move on theirs.

The full Vietnam-side scope for plant equipment is on our project cargo in Vietnam page.

Project Shipping prime mover with PROJECTSHIPPING.VN on the cab at a Cai Mep terminal during a flat rack job for a forwarder
Our prime mover at a Cai Mep terminal, March 2026, on a flat rack job for a forwarder.

Cross-trade project cargo through the network: which set-up fits?

In network work, the forwarder who sells the job often sits in a third country. Through WCA Projects and OPCA we see four set-ups. Vietnam is at one end in the first three; the fourth, true cross-trade, does not touch Vietnam.

Set-upTypical exampleWhat we doWhat the other member does
Import into Vietnam, sold by an agent abroadGerman agent, machine line from Hamburg to a factory in Dong NaiDestination agent: customs, discharge, permits, trucking to the foundationOrigin pick-up, export clearance, booking
Export from Vietnam, sold by an agent at destinationAgent in the Middle East, steel structure from Ho Chi Minh CityOrigin agent: pick-up at the factory, lashing, export customs, portDestination clearance and delivery
Triangle, agent in country A, cargo Vietnam → country CAgent in Karachi asking for a box from Ho Chi Minh City to Jebel Ali (a real enquiry, October 2026)Vietnam origin, under the agent’s instructionsA member in country C handles arrival; the agent coordinates both
Foreign to foreign, no Vietnam legChina to AustraliaWe coordinate between the two members under one instructionOrigin and destination members each handle their own country

In the last row we own neither end, and we say so upfront. What we add there is coordination and members we have already vetted, not our own trucks or customs desk.

For export-side detail, see export from Vietnam; for transit to inland neighbours, see Vietnam Cambodia transit.

How we vet the other end of the project forwarding network

In any project forwarding network, a logo is a starting point, not a check. When we appoint an agent abroad for one of our own jobs, our vendor procedure asks for more than the directory listing.

  • Network membership first. We prefer members of WCA, OPCA or FIATA for overseas agents.
  • At least two quotes. We compare two agents for a new country before we commit a customer’s cargo.
  • Legal documents. We collect the business registration and match the legal name against the invoice and the B/L.
  • Consignee-nominated companies. When the customer names a company at destination, we still ask for its full legal name, address and role before documents are issued.

You can check us the same way. Our legal name is Project Shipping Transport Company Limited, tax code 0314547361, head office 1B Dien Bien Phu, Thanh My Tay Ward, Ho Chi Minh City.

WCA runs a financial protection plan for its members; the current terms are on wcaworld.com. The project-specialist network itself is at wcaprojects.com.

Send L×W×H + weight, the port and the site. Get a Vietnam-side plan and net rate within 2 working hours.

Tell us your network and member ID. We reply with the trailer, the permit lead time and what customs needs before the vessel arrives.

Cross-trade documents: neutral paperwork without double title

In cross-trade inside a project forwarding network, the selling agent often does not want the shipper and the consignee to see each other’s prices. That is normal. The risk is in how the second set of documents is issued.

  • Switch B/L only after full recovery. If a switch is needed, the second set comes only when all three originals of the first set are surrendered. Two live sets means two parties can claim the cargo.
  • LOI is an exception. A letter of indemnity moves the risk to the signer. We accept one only from a party with the means to stand behind it, and our CEO signs off each case.

For imports, the documents also have to fit Vietnamese customs. Our customs clearance guide lists what is checked at arrival.

A real job: a flat rack for a forwarder, Cai Mep to Long An

In March 2026 a forwarder used us as its trucking desk for a 40′ flat rack discharged at a Cai Mep terminal and delivered to Ben Luc, Long An.

Large red tank on a Project Shipping lowbed with the prime mover at a factory site in southern Vietnam

40′ flat rack: Cai Mep → Ben Luc, Long An

Cargo
One 40′ flat rack under tarpaulin
Route
Cai Mep terminal (reach stacker loading) → Ben Luc, Long An
Equipment
Our own prime mover and lowbed
Result
Delivered to Ben Luc, Long An, March 2026

Photo: a different job on the same fleet, a red tank on our lowbed at a site in southern Vietnam, March 2026.

Later, one of this forwarder’s cargo owners appeared in port data we monitor. We marked it as the forwarder’s customer, not as a new lead for our sales team.

What our end of the network can carry

Agents in a project forwarding network ask the same question before nominating a Vietnam member: how big can it be? These are our own limits and the equipment we bring in above them.

ItemOur ownThrough partners
6-axle lowbed14.5 m deck, 3.2 m wide, up to 62 t, 1.6 m gooseneck–
4-axle lowbeds2 units for flat racks and mid-size machines–
Over-width flat racksPermit already held for about 3.3 m wide on our trucks–
Heavier or longer piecesPlanning and permitsExtendable and modular trailers
LiftingLifting plan with the crane ownerMobile cranes 25–500 t, forklifts 2–25 t, SPMT

The heaviest single piece we have delivered so far was 135 t. Above our own 62 t, the move runs on partner trailers. Details on heavy haulage in Vietnam and oversize permits.

Project Shipping prime mover with company name on the cab pulling a container on a lowbed at a port gate in Ho Chi Minh City
Our prime mover leaving a Ho Chi Minh City port gate with a 40′ box on a lowbed, 2026.

How a project forwarding network job runs with us

For WCA Projects and OPCA members the steps are the same for a single flat rack and a full plant.

1. EnquiryNetwork, member ID, L×W×H, weight, port and site. Drawings help.
2. Plan and net rateTrailer, permit lead time, customs route and a Vietnam-side net rate within 2 working hours.
3. Before arrivalDocuments checked, permit filed, crane booked if needed, all under your reference.
4. DeliveryDischarge, customs, trucking to site; photos to you at each step.
  • We never contact your customer. Updates, photos and documents go to you unless you instruct otherwise.
  • Net rates for network members. WCA (including WCA Projects) and OPCA members get net rates on the Vietnam side.
  • One desk. Customs, permits, trucking and lifting sit with one team in Ho Chi Minh City.

Our short partner page is at projectshipping.vn/agents, and the company profile (PDF) has photos of our fleet and past jobs.

FAQ: working with us in a project forwarding network

Which networks are you a member of?
WCA, including WCA Projects, with ID 135393, and OPCA at Gold level with ID 75121659. Send your member ID with the enquiry so we apply net rates.
Do you handle cross-trade shipments that do not touch Vietnam?
Yes, as coordinator between network members at origin and destination. We say upfront that neither end is our own operation.
Can a triangle shipment from Vietnam use a switch B/L?
We review it case by case. Our rule: the second set comes only after all three originals of the first set are surrendered. We do not accept two live sets for the same cargo.
Will you contact our customer in Vietnam?
No. We never contact your customer unless you instruct us to. Updates, photos and documents go to you.
Which equipment is your own?
A 6-axle lowbed with a 14.5 m deck and up to 62 t payload, and two 4-axle lowbeds. Cranes 25–500 t, SPMT and modular trailers come from long-term partners, and we tell you which is which.
How fast do we get a rate?
Within 2 working hours once we have L×W×H, weight, port and site. Over-width or heavy pieces may need a route survey before the final figure.

Related pages

Project cargo in Vietnam

Door-to-site scope: survey, permits, customs and lowbeds.

Project cargo →

Export from Vietnam

Origin agent work: factory pick-up, lashing, export customs.

Export guide →

Breakbulk and heavy lift

Ship’s gear, port cranes and hook-to-truck delivery in Vietnam.

Breakbulk →

OOG cargo

Flat racks, open tops and out-of-gauge trucking from Vietnamese ports.

OOG cargo →

Network job touching Vietnam? Send the drawing.

Tony Tuan, CEO: WhatsApp +84 909 411 668 · ceo@projectshipping.vn
Nura Tu, Overseas Department: WhatsApp +84 906 770 650 · overseas@projectshipping.vn
Calling from Vietnam: 0909 411 668

Last updated: November 2026

Request a quote Reply within 2 working hours · plan and net rate in one message

We use your details only to answer this request. We never contact your customer.

DOWNLOAD BẢNG GIÁ