Da Nang Port Guide for Project Cargo

Da Nang port is the main sea gate for central Vietnam: Tien Sa handled about 850,000 TEU and more than 15 million tonnes in 2025. This guide covers which terminal your cargo will use, what the new Lien Chieu port changes, and how heavy units actually move on Da Nang’s roads, with photos from our own night girder moves in the city.

For freight agents, carriers’ OOG desks and EPC contractors with sites in central Vietnam. · Jump to the road leg

Da Nang port area heavy haul: tractor with a precast concrete bridge girder waiting for a night move on Truong Son road
Precast bridge girder on a tractor and steerable rear bogie, Truong Son road, Cam Le, Da Nang, waiting for the night window (August 2025).
VNDADUN/LOCODE for Da Nang port; Tien Sa is the main deep-water terminal
850,000TEU through Tien Sa in 2025, with more than 15 million tonnes of cargo
580+shipments handled by our desk, March to September 2026
2 htrucking plan and net rate once we have dimensions (working hours)

The usual problem with a Da Nang port booking is not the quay. It is the road between the quay and the site. A transformer, a girder or a crusher frame lands at Tien Sa on the Son Tra peninsula, and the route to the site crosses a city of bridges, flyovers and tight junctions. Nobody priced the night moves or the escort.

The second problem is choice. Many central Vietnam projects can be served by a direct call at Da Nang port or by discharge in the south and a long road move north. The cheaper option on paper is not always the one that arrives on time. This guide is written by the desk that plans those moves for agents and contractors.

What is Da Nang port: Tien Sa, Song Han, Lien Chieu and Chu Lai?

Da Nang port today means more than one quay. Since 1 July 2025, the former Quang Nam province is part of Da Nang city, so the Chu Lai port area in the south also sits inside the city. For planning, think of four areas.

AreaWhereStatusWhat it means for project cargo
Tien SaSon Tra peninsula, at the mouth of Da Nang bayOperating; main container and general cargo terminal of Da Nang Port JSCWhere most direct calls to Da Nang port discharge today, including flat racks and breakbulk
Song HanOn the Han river, in the cityOperating; small river terminal for ships up to about 5,000 DWTSmall coasters and barges only; not a heavy-lift berth
Lien ChieuNorthwest of the city, near the Hai Van passShared infrastructure finished March 2026; container terminal construction started April 2026Future main cargo port of Da Nang; plan around it from 2027 onward, not for this year’s cargo
Chu LaiNui Thanh, south of the former Quang Nam province, now Da Nang cityOperating; developed by THACO, with a 50,000-ton berthServes the Chu Lai economic zone; useful for sites in the south of the merged city

Sources: Wikipedia, Da Nang Port; Vietnam Government News, Lien Chieu container terminal; Viet Nam News, Chu Lai port. The Da Nang and Quang Nam port authorities were also merged into one Da Nang Maritime Port Authority from 1 August 2025, as VnEconomy reported.

Tien Sa port: what can it handle for OOG and heavy cargo?

Tien Sa port is the working heart of Da Nang port. Published figures list five berths with 965 m of quay, about 11 m navigation depth and a 450 m breakwater. A phase 2 upgrade finished in 2018 was designed to take ships of up to 70,000 DWT.

Volumes are growing. Tien Sa port handled about 850,000 TEU and more than 15 million tonnes in 2025, as Vietstock reported, and the port company targets more for 2026. The same port also receives cruise ships, so the yard and the gate are busy.

  • Flat racks and open tops. Tien Sa port works OOG containers on the services that call it. The question is whether your carrier accepts the over-width or over-height unit on that loop, not whether the quay can lift it.
  • Breakbulk and heavy pieces. General cargo and breakbulk ships discharge at Tien Sa port. For any piece near the limit of the shore or ship’s gear, we confirm the lift plan with the terminal before booking. We never plan a heavy lift from a table.
  • Data older than your cargo. Several public berth and depth figures for Tien Sa date from before the 2018 upgrade. We check the current berth and draft for your vessel call, not a website number.
  • Space is tight. Tien Sa port shares the peninsula with the city and cruise traffic. Large pieces should leave the port soon after discharge, so the trailer and the permit must be ready on the day the ship berths.

For frame sizes and payloads of the containers themselves, see our flat rack container dimensions guide and the open top container guide.

Lien Chieu port: when will it change Da Nang port planning?

Lien Chieu is the new deep-water port of Da Nang, northwest of the city near the Hai Van pass. The city announced completion of the shared infrastructure, such as the breakwater and channel, in March 2026. Construction of the first container terminal, by a Hateco and APM Terminals consortium, started on 25 April 2026.

For a project shipping this year, Lien Chieu is not yet a port of discharge. Your cargo will still use Tien Sa port. What Lien Chieu changes is the longer plan: Tien Sa is expected to shift toward passenger and cruise traffic over time, while heavy cargo moves to Lien Chieu. For EPC contractors bidding on projects with deliveries in 2027 and later, the route survey should look at both ports.

Why Lien Chieu matters for road legs from Da Nang port: Lien Chieu sits on the northwest edge of the city, close to the national road toward Hue and the Hai Van tunnel. Sites north and west of Da Nang will have a shorter road leg from Lien Chieu than from Tien Sa, which sits east of the Han river.

Chu Lai port: the southern gate of the merged Da Nang city

Chu Lai port, in Nui Thanh, used to be “Quang Nam”. After the merger on 1 July 2025, it is inside Da Nang city, together with the Chu Lai open economic zone and its automotive and mechanical industry. THACO, which develops the port, has opened a 50,000-ton berth there and plans further expansion.

For project cargo, Chu Lai matters when the site is in the south of the merged city or in the Chu Lai economic zone. Discharging there instead of Tien Sa can cut a long road leg through Da Nang’s urban area. The question is the same as for any port: does a service with OOG acceptance call there for your sailing, and can the berth take the lift.

Da Nang port region project cargo: precast concrete girder on a girder trailer at night next to an overpass under construction
Precast girder parked on its trailer at the work site before erection, next to the overpass piers in Lien Chieu, Da Nang (August 2025).

Send L×W×H, weight, Da Nang ETA and site. Get a trucking plan and net rate within 2 working hours.

We say which port makes sense, which trailer, whether the road leg needs a permit and escort, and what it costs, so the rate you pass on is the rate you pay.

Da Nang port or discharge in the south: which is better for a central site?

Da Nang city is about 960 km north of Ho Chi Minh City. Many cargo owners still bring central Vietnam project cargo in through Cat Lai or Cai Mep and truck it north, because more mainline services and more OOG space call in the south. Both routes work. The right one depends on the cargo and the site.

QuestionPoints to a direct call at Da Nang portPoints to discharge in the south and road north
Sailing optionsA carrier or a breakbulk ship calls Tien Sa or Chu Lai on your datesOnly mainline services in the south accept your flat rack or open top
Cargo sizeOver-width, over-height or very heavy pieces, where every extra 100 km of permitted road adds riskStandard OOG within normal permit limits, which travels long distances without trouble
Site locationSite in or near Da Nang, Hue or the Chu Lai zoneSite further south, closer to Quy Nhon or Nha Trang than to Da Nang
Container returnThe flat rack can be returned in Da Nang within free timeThe cargo can be transloaded from the flat rack in Ho Chi Minh City, so the frame goes back early
CustomsClear at the port of discharge in Da NangClear in Ho Chi Minh City, then move as domestic cargo

A real example of the second route: in September 2026 we moved a large tank on a 40′ flat rack from Cat Lai port to a depot in Ho Chi Minh City, transloaded it to a lowbed, and trucked it to the Nhon Binh industrial cluster in Quy Nhon. The flat rack was returned in the south, and the tank travelled north on a trailer built for it.

Large tank on a 40ft flat rack loaded on a Project Shipping lowbed before the road move to Quy Nhon in central Vietnam
Tank on a 40′ flat rack on our lowbed in a Ho Chi Minh City depot, before transloading for the road move to Quy Nhon (September 2026).

How does the road leg from Da Nang port to a project site work?

For heavy cargo, the road leg from Da Nang port is where time and money go. A permitted oversize load runs only on the route and in the time window written on its permit, and in an urban area like Da Nang that usually means night moves.

  • The permit sets the route. An oversize or overweight load needs a road permit for the exact tractor, trailer and cargo. Bridges, flyovers and junctions decide the route, not the shortest line on a map. See our oversize permit guide for Vietnam.
  • Night windows in the city. The photos from our girder moves in Da Nang are stamped between 21:00 and 23:00, when traffic thins out. Plan the trailer, crew and escort for the night, and the receiving crane for the morning.
  • Escort and traffic control. Long and wide loads in the city move with traffic police control at junctions. This is booked ahead and sits in the plan, not added on the day.
  • The right trailer for the piece. Tall machinery goes on a lowbed; long girders and towers ride on a tractor and a steerable rear bogie, with the piece as the load bridge. Read about lowbed options in our lowbed trailer guide.
  • Hai Van pass and the tunnel. Loads to Hue and the north leave Da Nang past the Hai Van pass. Whether a piece uses the tunnel or the pass road is decided in the permit route, piece by piece.
Traffic police vehicle controlling a road in Da Nang at night during an oversize girder move
Traffic police control on the route during one of our night girder moves in Da Nang (August 2025).

Our project cargo jobs in Da Nang and central Vietnam

These jobs come from our own records, with customer names left out. Our heavy-haul fleet is based in the south; in central Vietnam we run the plan, permit check and site supervision from our desk, with local partners where needed.

DateCargoRoute and scope
Apr 202415 t of film and stage equipmentCustoms, trucking, lashing, loading and airfreight for a TV production in Phu Cat, Binh Dinh
Aug 2025Precast concrete bridge girdersNight road moves in Da Nang (Cam Le, Hoa Vang bypass, Lien Chieu) to an overpass site, with police control and crane erection at site
Jul 20266 cable reels on two lowbedsRoad move from the south to Khanh Hoa, central Vietnam
Sep 2026Large tank on a 40′ flat rackCat Lai port → depot in Ho Chi Minh City → transload to lowbed → Nhon Binh industrial cluster, Quy Nhon
Precast concrete girder on a steerable rear bogie on the Hoa Vang bypass in Da Nang at night

Bridge girders through Da Nang at night (August 2025)

Cargo
Precast concrete bridge girders for an overpass in Lien Chieu, Da Nang
Route
Truong Son road, Cam Le → Hoa Vang bypass → overpass site on Hai Van pass road, Lien Chieu
Equipment
Tractor units with a front bolster and a steerable rear bogie per girder; two mobile cranes for erection at site
Challenge
Long rigid loads through city junctions, night-only windows, traffic police control on the route
Result
Girders delivered in the night windows and lifted onto the piers by two mobile cranes in daylight; our team on site with time- and GPS-stamped photos at each step
Two mobile cranes lifting a precast girder onto overpass piers in Lien Chieu, Da Nang
Tandem lift of a girder onto the overpass piers in Lien Chieu, Da Nang, after the night delivery (August 2025).

Da Nang port checklist: what holds a heavy unit at the gate

This is what our desk checks before a truck leaves for Da Nang port or before a ship berths with project cargo.

Port and berthTien Sa, Chu Lai or a southern port, confirmed on the booking and the arrival notice, with the current berth and lift plan for heavy pieces.
Customs statusDeclaration ready before berthing. For duty-exempt project imports, the exemption list is in place before the first shipment.
Permit vs real sizeLength, width, height and gross weight on the terminal’s EIR or the survey match the road permit for the exact tractor and trailer.
Night window and siteEscort, night window and receiving crane booked; access to the site checked for the trailer length and turning space.
For agents abroad: ask your Vietnam partner which port they recommend and why, and ask for the permit route before you confirm the rate. A rate that ignores the road leg out of Da Nang port is not a door-to-site rate.

We are a customs agent recognized by Vietnam Customs (Decision 247/QD-TCHQ, 26 February 2025), so the declaration, the inspection and the trucking sit with one desk. See our customs clearance guide for project cargo. Carrier local charges at Da Nang port differ by line; see our Vietnam local charges tables.

FAQ: Da Nang port for OOG and project cargo

Is Tien Sa the same as Da Nang port?
Tien Sa is the main terminal of Da Nang port, on the Son Tra peninsula. Most container and general cargo calls at Da Nang port today discharge at Tien Sa. The smaller Song Han terminal on the river takes only small ships.
Can I ship project cargo to Lien Chieu port now?
Not yet. The shared infrastructure was finished in March 2026 and the first container terminal started construction in April 2026. For cargo arriving this year, plan on Tien Sa or Chu Lai.
Is Chu Lai port part of Da Nang now?
Yes. Since 1 July 2025 the former Quang Nam province, including Chu Lai, is part of Da Nang city, and the port authorities were merged from 1 August 2025.
Should I discharge at Da Nang port or in Ho Chi Minh City?
It depends on sailing options, cargo size and site location. Very large pieces for sites near Da Nang usually favour a direct call. Standard OOG for sites further south often travels better from Cat Lai or Cai Mep by road.
Do heavy loads in Da Nang move only at night?
Oversize loads in the city usually move in night windows set by the permit and traffic control. Our girder moves in Da Nang ran at night under traffic police control.
Do you work for agents without contacting their customer?
Yes. We work as your Vietnam desk. We never contact your customer, and you get photos at pick-up, lashing and delivery.

More guides for Vietnam port and project cargo planning

Vietnam ports guide

Cat Lai, Cai Mep, Hiep Phuoc, Haiphong and Da Nang compared for OOG and project cargo.

Vietnam ports →

Cai Mep port guide

Six deep-water terminals in the south, mainline flat rack calls and the road leg to factories.

Cai Mep port →

Haiphong port guide

Lach Huyen vs the river terminals, published trucking rates and OOG jobs in the north.

Haiphong port →

Project cargo in Vietnam

How we plan door-to-site moves for EPC contractors and agents.

Project cargo →

We are a licensed customs agent (Decision 247/QD-TCHQ, 2025) and a member of WCA and OPCA; see our page for agents and our heavy haulage service.

Moving project cargo through Da Nang port or to a site in central Vietnam?

Tony Tuan, CEO: WhatsApp +84 909 411 668 · ceo@projectshipping.vn
Nura Tu, Overseas Department: WhatsApp +84 906 770 650 · overseas@projectshipping.vn
Calling from Vietnam: 0909 411 668

Last updated: November 2026

Request a quote Reply within 2 working hours · plan and net rate in one message

We use your details only to answer this request. We never contact your customer.

DOWNLOAD BẢNG GIÁ