Haiphong port is the main gate for flat rack, open top and Ro-Ro units bound for factories around Hanoi, Bac Ninh and Hai Duong. This guide sets out which terminal your unit will call at, our published trucking rates from the port to 30 northern zones, and what we check before an oversize load leaves the gate.

For freight agents, carriers’ OOG desks and EPC contractors. · Jump to the trucking rates

Haiphong port: concrete pump boom on a 40ft flat rack loaded on a 6-axle lowbed in a container yard
Concrete pump boom, 10 × 2.5 × 3.7 m and 16 t, on a 40′ flat rack and a 6-axle lowbed in Haiphong before export to Jebel Ali (March 2024).
VNHPHUN/LOCODE for Haiphong port, which covers the river terminals and Lach Huyen
30northern trucking zones in our published Haiphong rate table, updated October 2026
580+shipments handled, March to September 2026
2 htrucking plan and net rate once we have dimensions (working hours)

The usual problem with Haiphong port is not the quay. A booking says “Haiphong”, the unit discharges at a Lach Huyen terminal 20 km out on Cat Hai island, and the trucking quote was built for a river terminal in the city. The truck is in the wrong place and the rate is wrong.

The OOG version is worse. A 40′ flat rack that fits the road permit on paper turns out 8 cm wider on the terminal’s EIR, and the unit waits in the yard while storage runs. This guide is written by the desk that plans those moves. It covers the two port areas, the terminals we use, our published rates and the jobs we have run through Haiphong port.

What is Haiphong port: the river terminals or Lach Huyen?

Haiphong port is a group of terminals under one UN/LOCODE, VNHPH, in two areas with very different water depth. For planning, treat them as two ports.

AreaWhereWho calls thereWhat it means for OOG
River and Dinh Vu terminalsAlong the Cam river in the city and on the Dinh Vu peninsulaIntra-Asia, China and feeder services; general cargo and breakbulk vesselsCloser to the city’s industrial zones; most northern breakbulk is worked here
Lach Huyen deep-water areaCat Hai island, reached by the Tan Vu–Lach Huyen bridgeMainline container services to the US, Europe and the Middle EastLarger ships, longer road leg, and our rate table adds a surcharge

The split decides the road leg. A flat rack on a China feeder usually lands on the river side or at Dinh Vu. The same unit on a transpacific or Europe service is likely to discharge at Lach Huyen. Always check the terminal on the arrival notice, not just “Haiphong”.

Which Haiphong port terminal will your cargo use?

These are the terminals that appear most often on our northern job files. Figures come from the operators and the Vietnam Seaports Association; we check the current position for your vessel before you book.

TerminalAreaPublished dataTypical use for our cargo
TC-HICT (Lach Huyen berths 1–2)Lach Huyen2 berths, 750 m; 16 m water at berth, 14 m channel; ships up to 165,000 DWT or 14,000 TEUMainline flat racks and open tops
HTIT (Lach Huyen berths 3–4)Lach HuyenHai Phong Port and TIL (MSC group) joint venture; opened 2025MSC-group services
HHIT (Lach Huyen berths 5–6)Lach HuyenDeveloped by Hateco Group; opened April 2025Mainline container services
Nam Dinh Vu (Gemadept)Dinh VuDeep-water container terminal on the Dinh Vu peninsulaOpen tops to Bac Ninh in 2026
Dinh Vu area (Hai Phong Port)Dinh VuBerths of 215–230 m, about 10.5 m waterContainers and general cargo; heavy-lift calls
Hoang Dieu and Chua Ve (Hai Phong Port)River, city sideAbout 8.4 m water; shore cranes up to 40 t; floating cranes listed up to 80 tBreakbulk, steel and project cargo on smaller ships

Sources: Saigon Newport, TC-HICT and the Vietnam Seaports Association, Port of Hai Phong. Crane lists change; for a heavy piece we confirm the lift plan with the terminal, never from a table.

For project cargo, the group’s breakbulk terminals still matter. In April 2026, Dinh Vu and Hoang Dieu–Chua Ve jointly worked one vessel with more than 21,700 t of steel and oversize equipment for a cement plant, in 86 hours, as the port reported.

40ft open top container with tarpaulin on a trailer at Nam Dinh Vu terminal in Haiphong port at night
Tarped 40′ open top on the trailer at Nam Dinh Vu, one of 2 units to Bac Ninh (May 2026).

Can Haiphong port handle flat racks, open tops and Ro-Ro?

Yes. Flat racks, open tops, Ro-Ro and breakbulk all move through Haiphong port every week. What decides your plan is the chain around the quay.

  • Carrier OOG acceptance. The carrier must accept the over-width or over-height unit on that loop. That choice also sends it to Lach Huyen or to the river side.
  • Gross weight with the frame. A 40′ flat rack weighs about 5 to 6 t empty. Two 16 t pump booms we shipped became 22.2 t gross each, and that is the weight the permit and the terminal see.
  • Height on the road. Cargo 3.7 m tall on a flat rack deck of about 0.64 m, plus the trailer deck, is over the legal height for a container truck. That move needs a road permit, so the permit goes into the plan on day one.
  • The right trailer. Tall units go on a lowbed or a multi-axle trailer with a low deck. Our own heavy-haul fleet is based in the south. For Haiphong we book northern trailer partners and run the plan, permit check and photos from our desk.

For frame sizes and payloads, see our flat rack container dimensions and open top container guides. For self-driven units, see Ro-Ro shipping in Vietnam.

Scania trucks and chassis lashed on the deck of a Ro-Ro vessel bound for Haiphong port
20 Scania trucks and chassis on the Ro-Ro deck, Singapore → Haiphong port, import (January 2024). Units that drive need no lift at all.

How much is container trucking from Haiphong port?

We publish our trucking rates from Haiphong port for standard containers. The table below is a selection from the 30 zones; the full table (Vietnamese) is updated from the same source.

Delivery zone (industrial zones)Area20DC or 40HC, VND per trip
Trang Due, An Duong, Do Son, VSIP Thuy Nguyen, NomuraHai Phong2,100,000
Nam Cau KienHai Phong2,400,000
Dai An, Cam Giang, Nam Sach, Tan TruongHai Duong4,200,000
Pho Noi, Yen My, My Hao, Thang Long IIHung Yen4,600,000
VSIP, Que Vo, Yen Phong, Tien Son, Thuan ThanhBac Ninh5,300,000
Sai Dong, Dai TuHanoi5,400,000
Dinh Tram, Quang Chau, Van Trung, Song Khe–Noi HoangBac Giang5,700,000
Dong Van, Hoa Mac, Thanh LiemHa Nam5,700,000
Quang Minh, Thang Long, Dong Anh, Hoa LacHanoi6,100,000
Noi Bai, Soc Son, Thach ThatHanoi6,200,000
Ba Thien, Binh Xuyen, Khai QuangVinh Phuc6,200,000
Pho Yen, Diem Thuy, Song CongThai Nguyen6,200,000
Nghi Son economic zoneThanh Hoa8,200,000
Nghi Phu, Dong Vinh, VSIP Nghe AnNghe An12,700,000

Rates as of 11 October 2026, based on diesel at VND 29,120 per liter. They exclude VAT and lift-on/lift-off at the terminal or depot. Area names follow our tariff, which keeps the former province names; several provinces merged in 2025.

Read this before you use the table for OOG: these are rates for standard dry boxes within the weight limits below. Flat racks, open tops and loose cargo are priced per job, because the trailer, the permit and the route change with every unit. Send the dimensions and we price that unit.

Which extra lines apply at Haiphong port?

A Haiphong quote is complete only when the lines below are priced or marked out of scope. These come from the conditions on our published rate table.

LineAmount or ruleWhen it applies
Lach Huyen surchargeVND 350,000Empty pick-up or laden drop at Lach Huyen instead of the river side
Customs supervision signingVND 200,000 per container (green channel); VND 350,000 (red channel)If the declaration needs a supervision sign-off at the gate
Truck waiting timeVND 1,000,000, excluding VATAfter 8 hours from the truck’s arrival at the loading or delivery point
Weight limitBelow 13 t for a 20DC; below 23 t for a 40DC or 40HCA 40HC of 25 to 27 t is priced separately
Fuel clauseRates reviewed if diesel moves by 5% or moreBoth sides agree the new rate before it applies
Lift-on/lift-off, restricted roads, laborAt costPaid as disbursements against the terminal or depot receipt

Carrier local charges (THC, DOC, D/O, CIC) sit on top and differ by line. See our Vietnam local charges tables.

Send L×W×H, weight, Haiphong ETA and site. Get a trucking plan and net rate within 2 working hours.

We say which terminal, which trailer and whether a permit is needed, so the rate you pass on is the rate you pay.

How does the road leg from Lach Huyen to Hanoi and Bac Ninh work?

Most northern factories sit west of Haiphong port, along the corridor to Hanoi. The rate table shows the steps: about VND 2.1 million inside Hai Phong, 4.2 to 4.6 million to Hai Duong and Hung Yen, and 5.3 to 6.2 million to Bac Ninh, Hanoi and Vinh Phuc.

  • Lach Huyen adds a leg. Units from Lach Huyen cross the Tan Vu–Lach Huyen bridge before they join the routes inland. For a standard box this is the VND 350,000 line; for an oversize load it is part of the permitted route.
  • The permit sets the route and hours. An oversize load runs only on the route written on its permit. Bridges, flyovers and toll plazas on the way decide whether a tall unit passes or goes around.
  • Destuffing at port is an option. When cargo on a flat rack is too tall for the road, the cleaner plan can be to lift it off at the terminal onto a lowbed. We price both options before you book.
  • Plan 48 hours ahead. Our rate terms ask for time, pick-up and delivery points at least 48 hours in advance, and earlier for permitted loads.
Two XCMG excavators lashed on a 40ft flat rack in a Haiphong yard before export
Two XCMG XE245GH excavators, lashed on a 40′ flat rack in Haiphong for export to Istanbul. Loading, lashing, trucking and customs by us (April 2024).

Our jobs through Haiphong port

These jobs come from our own records, with customer names left out. They cover imports, exports, Ro-Ro and OOG containers.

DateCargoRoute and scope
Dec 2023Concrete pump truck, Ro-RoHaiphong → Turkey, export
Jan 202420 Scania trucks, Ro-RoSingapore → Haiphong, import
Mar 20242 concrete pump booms, 16 t each, on 2 × 40′ flat racksHanoi → Haiphong → Jebel Ali: loading, lashing, trucking, export customs, ocean freight
Apr 20242 XCMG XE245GH excavators on a 40′ flat rackHaiphong → Istanbul: loading, lashing, trucking, customs, ocean freight
May 20262 × 40′ open topsNam Dinh Vu, Haiphong → Bac Ninh
Jun 20261 × 40′ flat rack and 1 × 40′ open topHaiphong port → yard in Hai Phong
Aug 20261 × 40′ open topNam Dinh Vu, Haiphong → Tu Son, Bac Ninh
Concrete pump boom lifted by mobile crane onto a 40ft flat rack at night near Haiphong port

Export pump booms, Hanoi to Jebel Ali via Haiphong (March 2024)

Cargo
2 concrete pump booms, each 10 × 2.5 × 3.7 m and 16 t
Route
Hanoi → stuffing yard in Haiphong → Haiphong port → Jebel Ali, UAE
Equipment
Tractor for the loose leg, mobile crane, 2 × 40′ flat racks, 6-axle trailer into the port
Challenge
Over-width and over-height, center of gravity toward the boom end, stuffing at night
Result
Both flat racks in the terminal before closing; the carrier accepted the lashing certificate
Mobile crane working in a Haiphong port container yard during a flat rack and open top job
Crane work in a Haiphong container yard during our 1 × 40′ flat rack and 1 × 40′ open top job (June 2026).

Haiphong port checklist: what holds an OOG unit at the gate

This is what our desk checks before a truck leaves for Haiphong port.

Terminal and D/ODelivery order for the exact terminal: Lach Huyen, Dinh Vu or the river side. Not just “Haiphong”.
Customs statusDeclaration cleared and any supervision sign-off arranged for the gate-out.
EIR vs permitLength, width, height and gross weight on the terminal’s EIR match the permit for the exact tractor and trailer.
Site readyCrane or forklift at site booked for the arrival window, with access checked for the trailer length.
For exports: book the empty flat rack or open top early, and confirm which terminal the vessel uses before the cargo is loaded. A unit trucked to the river side for a Lach Huyen vessel misses the cut-off.

We are a customs agent recognized by Vietnam Customs (Decision 247/QD-TCHQ, 26 February 2025), so the declaration, the inspection and the trucking sit with one desk. See our customs clearance guide for project cargo.

FAQ: Haiphong port for OOG and project cargo

Is Lach Huyen the same as Haiphong port?
Lach Huyen is the deep-water area of Haiphong port, on Cat Hai island. It shares the UN/LOCODE VNHPH with the river and Dinh Vu terminals, so check the terminal name on the arrival notice before you book trucking.
Does trucking from Lach Huyen cost more than from the river terminals?
On our published rate table, an empty pick-up or a laden drop at Lach Huyen adds VND 350,000 to the zone rate. For oversize loads, the longer leg is priced inside the permitted route.
Do your published Haiphong rates apply to flat racks and open tops?
No. The table covers standard 20DC and 40HC containers within the weight limits. Flat racks, open tops and loose cargo are priced per job, because the trailer, permit and route depend on the unit.
Does a tall flat rack from Haiphong need a road permit?
Usually yes. Cargo about 3.7 m tall on a flat rack deck and a trailer is over the legal height for a container truck, so the move needs a road permit and a set route. We check this when we get the dimensions.
Can you handle Ro-Ro units at Haiphong?
Yes. We have handled Ro-Ro imports and exports at Haiphong, including 20 Scania trucks from Singapore in January 2024.
Do you work for agents without contacting their customer?
Yes. We work as your Vietnam desk. We never contact your customer, and you get photos at pick-up, lashing and delivery.

More guides for Vietnam port and OOG planning

Vietnam ports guide

Cat Lai, Cai Mep, Hiep Phuoc, Haiphong and Da Nang compared for OOG and project cargo.

Vietnam ports →

Cat Lai port guide

The FR/OT customs step, ePort EIR checks and night truck windows in Ho Chi Minh City.

Cat Lai port →

Shipping China to Vietnam

Project and OOG cargo from Chinese ports to Haiphong and the south.

China to Vietnam →

Da Nang port guide

Tien Sa, Lien Chieu and Chu Lai, direct call vs road from the south, and our night girder moves in Da Nang.

Da Nang port →

Shipping Korea to Vietnam

Real Busan to Hai Phong files, transit days and carriers for machinery from Korea.

Korea to Vietnam →

We are a licensed customs agent (Decision 247/QD-TCHQ, 2025) and a member of WCA and OPCA; see our page for agents and our OOG cargo service.

Moving OOG or project cargo through Haiphong port this quarter?

Tony Tuan, CEO: WhatsApp +84 909 411 668 · ceo@projectshipping.vn
Nura Tu, Overseas Department: WhatsApp +84 906 770 650 · overseas@projectshipping.vn
Calling from Vietnam: 0909 411 668

Last updated: November 2026

Request a quote Reply within 2 working hours · plan and net rate in one message

We use your details only to answer this request. We never contact your customer.

DOWNLOAD BẢNG GIÁ