Haiphong port is the main gate for flat rack, open top and Ro-Ro units bound for factories around Hanoi, Bac Ninh and Hai Duong. This guide sets out which terminal your unit will call at, our published trucking rates from the port to 30 northern zones, and what we check before an oversize load leaves the gate.
For freight agents, carriers’ OOG desks and EPC contractors. · Jump to the trucking rates

The usual problem with Haiphong port is not the quay. A booking says “Haiphong”, the unit discharges at a Lach Huyen terminal 20 km out on Cat Hai island, and the trucking quote was built for a river terminal in the city. The truck is in the wrong place and the rate is wrong.
The OOG version is worse. A 40′ flat rack that fits the road permit on paper turns out 8 cm wider on the terminal’s EIR, and the unit waits in the yard while storage runs. This guide is written by the desk that plans those moves. It covers the two port areas, the terminals we use, our published rates and the jobs we have run through Haiphong port.
Haiphong port is a group of terminals under one UN/LOCODE, VNHPH, in two areas with very different water depth. For planning, treat them as two ports.
| Area | Where | Who calls there | What it means for OOG |
|---|---|---|---|
| River and Dinh Vu terminals | Along the Cam river in the city and on the Dinh Vu peninsula | Intra-Asia, China and feeder services; general cargo and breakbulk vessels | Closer to the city’s industrial zones; most northern breakbulk is worked here |
| Lach Huyen deep-water area | Cat Hai island, reached by the Tan Vu–Lach Huyen bridge | Mainline container services to the US, Europe and the Middle East | Larger ships, longer road leg, and our rate table adds a surcharge |
The split decides the road leg. A flat rack on a China feeder usually lands on the river side or at Dinh Vu. The same unit on a transpacific or Europe service is likely to discharge at Lach Huyen. Always check the terminal on the arrival notice, not just “Haiphong”.
These are the terminals that appear most often on our northern job files. Figures come from the operators and the Vietnam Seaports Association; we check the current position for your vessel before you book.
| Terminal | Area | Published data | Typical use for our cargo |
|---|---|---|---|
| TC-HICT (Lach Huyen berths 1–2) | Lach Huyen | 2 berths, 750 m; 16 m water at berth, 14 m channel; ships up to 165,000 DWT or 14,000 TEU | Mainline flat racks and open tops |
| HTIT (Lach Huyen berths 3–4) | Lach Huyen | Hai Phong Port and TIL (MSC group) joint venture; opened 2025 | MSC-group services |
| HHIT (Lach Huyen berths 5–6) | Lach Huyen | Developed by Hateco Group; opened April 2025 | Mainline container services |
| Nam Dinh Vu (Gemadept) | Dinh Vu | Deep-water container terminal on the Dinh Vu peninsula | Open tops to Bac Ninh in 2026 |
| Dinh Vu area (Hai Phong Port) | Dinh Vu | Berths of 215–230 m, about 10.5 m water | Containers and general cargo; heavy-lift calls |
| Hoang Dieu and Chua Ve (Hai Phong Port) | River, city side | About 8.4 m water; shore cranes up to 40 t; floating cranes listed up to 80 t | Breakbulk, steel and project cargo on smaller ships |
Sources: Saigon Newport, TC-HICT and the Vietnam Seaports Association, Port of Hai Phong. Crane lists change; for a heavy piece we confirm the lift plan with the terminal, never from a table.
For project cargo, the group’s breakbulk terminals still matter. In April 2026, Dinh Vu and Hoang Dieu–Chua Ve jointly worked one vessel with more than 21,700 t of steel and oversize equipment for a cement plant, in 86 hours, as the port reported.

Yes. Flat racks, open tops, Ro-Ro and breakbulk all move through Haiphong port every week. What decides your plan is the chain around the quay.
For frame sizes and payloads, see our flat rack container dimensions and open top container guides. For self-driven units, see Ro-Ro shipping in Vietnam.

We publish our trucking rates from Haiphong port for standard containers. The table below is a selection from the 30 zones; the full table (Vietnamese) is updated from the same source.
| Delivery zone (industrial zones) | Area | 20DC or 40HC, VND per trip |
|---|---|---|
| Trang Due, An Duong, Do Son, VSIP Thuy Nguyen, Nomura | Hai Phong | 2,100,000 |
| Nam Cau Kien | Hai Phong | 2,400,000 |
| Dai An, Cam Giang, Nam Sach, Tan Truong | Hai Duong | 4,200,000 |
| Pho Noi, Yen My, My Hao, Thang Long II | Hung Yen | 4,600,000 |
| VSIP, Que Vo, Yen Phong, Tien Son, Thuan Thanh | Bac Ninh | 5,300,000 |
| Sai Dong, Dai Tu | Hanoi | 5,400,000 |
| Dinh Tram, Quang Chau, Van Trung, Song Khe–Noi Hoang | Bac Giang | 5,700,000 |
| Dong Van, Hoa Mac, Thanh Liem | Ha Nam | 5,700,000 |
| Quang Minh, Thang Long, Dong Anh, Hoa Lac | Hanoi | 6,100,000 |
| Noi Bai, Soc Son, Thach That | Hanoi | 6,200,000 |
| Ba Thien, Binh Xuyen, Khai Quang | Vinh Phuc | 6,200,000 |
| Pho Yen, Diem Thuy, Song Cong | Thai Nguyen | 6,200,000 |
| Nghi Son economic zone | Thanh Hoa | 8,200,000 |
| Nghi Phu, Dong Vinh, VSIP Nghe An | Nghe An | 12,700,000 |
Rates as of 11 October 2026, based on diesel at VND 29,120 per liter. They exclude VAT and lift-on/lift-off at the terminal or depot. Area names follow our tariff, which keeps the former province names; several provinces merged in 2025.
A Haiphong quote is complete only when the lines below are priced or marked out of scope. These come from the conditions on our published rate table.
| Line | Amount or rule | When it applies |
|---|---|---|
| Lach Huyen surcharge | VND 350,000 | Empty pick-up or laden drop at Lach Huyen instead of the river side |
| Customs supervision signing | VND 200,000 per container (green channel); VND 350,000 (red channel) | If the declaration needs a supervision sign-off at the gate |
| Truck waiting time | VND 1,000,000, excluding VAT | After 8 hours from the truck’s arrival at the loading or delivery point |
| Weight limit | Below 13 t for a 20DC; below 23 t for a 40DC or 40HC | A 40HC of 25 to 27 t is priced separately |
| Fuel clause | Rates reviewed if diesel moves by 5% or more | Both sides agree the new rate before it applies |
| Lift-on/lift-off, restricted roads, labor | At cost | Paid as disbursements against the terminal or depot receipt |
Carrier local charges (THC, DOC, D/O, CIC) sit on top and differ by line. See our Vietnam local charges tables.
We say which terminal, which trailer and whether a permit is needed, so the rate you pass on is the rate you pay.
Most northern factories sit west of Haiphong port, along the corridor to Hanoi. The rate table shows the steps: about VND 2.1 million inside Hai Phong, 4.2 to 4.6 million to Hai Duong and Hung Yen, and 5.3 to 6.2 million to Bac Ninh, Hanoi and Vinh Phuc.

These jobs come from our own records, with customer names left out. They cover imports, exports, Ro-Ro and OOG containers.
| Date | Cargo | Route and scope |
|---|---|---|
| Dec 2023 | Concrete pump truck, Ro-Ro | Haiphong → Turkey, export |
| Jan 2024 | 20 Scania trucks, Ro-Ro | Singapore → Haiphong, import |
| Mar 2024 | 2 concrete pump booms, 16 t each, on 2 × 40′ flat racks | Hanoi → Haiphong → Jebel Ali: loading, lashing, trucking, export customs, ocean freight |
| Apr 2024 | 2 XCMG XE245GH excavators on a 40′ flat rack | Haiphong → Istanbul: loading, lashing, trucking, customs, ocean freight |
| May 2026 | 2 × 40′ open tops | Nam Dinh Vu, Haiphong → Bac Ninh |
| Jun 2026 | 1 × 40′ flat rack and 1 × 40′ open top | Haiphong port → yard in Hai Phong |
| Aug 2026 | 1 × 40′ open top | Nam Dinh Vu, Haiphong → Tu Son, Bac Ninh |


This is what our desk checks before a truck leaves for Haiphong port.
We are a customs agent recognized by Vietnam Customs (Decision 247/QD-TCHQ, 26 February 2025), so the declaration, the inspection and the trucking sit with one desk. See our customs clearance guide for project cargo.
Cat Lai, Cai Mep, Hiep Phuoc, Haiphong and Da Nang compared for OOG and project cargo.
Vietnam ports →The FR/OT customs step, ePort EIR checks and night truck windows in Ho Chi Minh City.
Cat Lai port →Project and OOG cargo from Chinese ports to Haiphong and the south.
China to Vietnam →Tien Sa, Lien Chieu and Chu Lai, direct call vs road from the south, and our night girder moves in Da Nang.
Da Nang port →Real Busan to Hai Phong files, transit days and carriers for machinery from Korea.
Korea to Vietnam →We are a licensed customs agent (Decision 247/QD-TCHQ, 2025) and a member of WCA and OPCA; see our page for agents and our OOG cargo service.
Tony Tuan, CEO: WhatsApp +84 909 411 668 · ceo@projectshipping.vn
Nura Tu, Overseas Department: WhatsApp +84 906 770 650 · overseas@projectshipping.vn
Calling from Vietnam: 0909 411 668
Last updated: November 2026




© 2017 – 2026 Project Shipping. Design by Thiết kế Web DC