Carrier tariff · Maersk · Vietnam
Maersk export THC 3,250,000 VND (excl. VAT) per 20′ and 5,000,000 VND (excl. VAT) per 40′. Every figure below comes from the Maersk Vietnam tariff, checked on 02 Oct 2026.
Source: Maersk tariff page (Vietnamese) · Jump to the export table

Maersk local charges in Vietnam are the fees Maersk collects at the Vietnamese port on top of ocean freight: terminal handling (THC), the B/L or delivery order fee, seal, telex release, manifest filing and, on some trades, a container imbalance charge (CIC).
Maersk is a Danish shipping and logistics group headquartered in Copenhagen. This page lists the Maersk local charges in Vietnam that we hold on file, line by line, with the date we last checked them against the carrier’s published tariff. It is written for freight forwarders and shippers who need to budget a Maersk booking from or to Vietnam.
For the full comparison with other carriers, see our hub of local charges in Vietnam by shipping line.
Export Maersk local charges are paid by the shipper in Vietnam before the B/L is released. Amounts as published by Maersk; “n/a” means the item is billed per B/L or not published for that size.
| Charge | Container | Port | 20′ | 40′ | 45′ / per B/L | Unit | Currency · VAT |
|---|---|---|---|---|---|---|---|
| OHC – export THC | Dry (DC/HC) | All Vietnam ports | 3,250,000 | 5,000,000 | 6,050,000 | per container | VND · excl. VAT |
| OHC – export THC | Reefer | All Vietnam ports | 4,150,000 | 6,350,000 | n/a | per container | VND · excl. VAT |
| OHC – export THC | Open top / flat rack | All Vietnam ports | 4,350,000 | 6,650,000 | n/a | per container | VND · excl. VAT |
| ODF – export documentation fee (outside intra-Asia) | All types | All Vietnam ports | n/a | n/a | 950,000 | per B/L | VND · excl. VAT |
| ODF – export documentation fee (intra-Asia) | All types | All Vietnam ports | n/a | n/a | 850,000 | per B/L | VND · excl. VAT |
| Reefer power, export (port plugging) | Reefer | Ho Chi Minh City | 23.75 | 42.75 | n/a | per container per day | USD · excl. VAT |
| Reefer power, export (port plugging) | Reefer | Hai Phong | 38 | 76 | n/a | per container per day | USD · excl. VAT |
| Reefer power, export (port plugging) | Reefer | Da Nang | 23.75 | 42.75 | n/a | per container per day | USD · excl. VAT |
| Reefer power, export (port plugging) | Reefer | Quy Nhon | 23.75 | 42.75 | n/a | per container per day | USD · excl. VAT |
| Late payment fee | All types | All Vietnam ports | n/a | n/a | 500,000 | per 7 days | VND · excl. VAT |

Import Maersk local charges are paid by the consignee when collecting the delivery order. Cleaning and maintenance items depend on the cargo type, so check which row applies to your goods.
| Charge | Container | Port | 20′ | 40′ | 45′ / per B/L | Unit | Currency · VAT |
|---|---|---|---|---|---|---|---|
| DHC – import THC | Dry (DC/HC) | All Vietnam ports | 3,250,000 | 5,000,000 | 6,050,000 | per container | VND · excl. VAT |
| DHC – import THC | Reefer | All Vietnam ports | 4,150,000 | 6,350,000 | n/a | per container | VND · excl. VAT |
| DHC – import THC | Open top / flat rack | All Vietnam ports | 4,350,000 | 6,650,000 | n/a | per container | VND · excl. VAT |
| DDF – import document fee (outside intra-Asia) | All types | All Vietnam ports | n/a | n/a | 950,000 | per B/L | VND · excl. VAT |
| DDF – import document fee (intra-Asia) | All types | All Vietnam ports | n/a | n/a | 850,000 | per B/L | VND · excl. VAT |
| Reefer power, import (included in DEM) | Reefer | Ho Chi Minh City | 20.9 | 38 | n/a | per container per day | USD · excl. VAT |
| Reefer power, import (included in DEM) | Reefer | Quy Nhon | 20.9 | 38 | n/a | per container per day | USD · excl. VAT |
| Reefer power, import (included in DEM) | Reefer | Hai Phong | 40 | 80 | n/a | per container per day | USD · excl. VAT |
| Reefer power, import (included in DEM) | Reefer | Da Nang | 28.5 | 42.75 | n/a | per container per day | USD · excl. VAT |
| PAD – change of local-charge payer at / after ETA | All types | All Vietnam ports | n/a | n/a | 900,000 | per request | VND · excl. VAT |
Flat rack or open top? Add L×W×H and weight so we can check OOG acceptance with Maersk first.
These Maersk local charges apply only to special equipment or out-of-gauge cargo. For flat rack and open top bookings we check OOG acceptance with the line before you confirm, and plan the trucking to the port. See OOG cargo handling in Vietnam and project cargo door-to-site.
| Charge | Container | Port | 20′ | 40′ | 45′ / per B/L | Unit | Currency · VAT |
|---|---|---|---|---|---|---|---|
| DHC – import THC | Open top / flat rack | All Vietnam ports | 4,350,000 | 6,650,000 | n/a | per container | VND · excl. VAT |
| OHC – export THC | Open top / flat rack | All Vietnam ports | 4,350,000 | 6,650,000 | n/a | per container | VND · excl. VAT |
DEM/DET sits outside the Maersk local charges themselves but often costs more. Demurrage (DEM) runs while the full container stays in the port after free time; detention (DET) runs while the box is outside the port. Some Maersk tariffs combine both into one count. Rates are per container per day.
The table shows the tiers for all Vietnam ports and Ho Chi Minh City; the full Maersk scale by port is on the Vietnamese tariff page.
| Charge | Type | Container | Port | Free time | Days | 20′ / day | 40′ / day | Currency |
|---|---|---|---|---|---|---|---|---|
| DEM – import | Demurrage (DEM) | Dry (DC/HC) | All Vietnam ports | 4 calendar days | days 11–25 | 41.8 | 83.6 | USD |
| DEM – import | Demurrage (DEM) | Open top / flat rack | All Vietnam ports | 4 calendar days | days 11–25 | 83.6 | 83.6 | USD |
| DEM – import | Demurrage (DEM) | Dry (DC/HC) | All Vietnam ports | 4 calendar days | days 1–3 | 14 | 28 | USD |
| DEM – import | Demurrage (DEM) | Open top / flat rack | All Vietnam ports | 4 calendar days | days 1–3 | 28 | 28 | USD |
| DEM – import | Demurrage (DEM) | Dry (DC/HC) | All Vietnam ports | 4 calendar days | day 26+ | 57 | 114 | USD |
| DEM – import | Demurrage (DEM) | Open top / flat rack | All Vietnam ports | 4 calendar days | day 26+ | 114 | 114 | USD |
| DEM – import | Demurrage (DEM) | Dry (DC/HC) | All Vietnam ports | 4 calendar days | days 4–10 | 23 | 46 | USD |
| DEM – import | Demurrage (DEM) | Open top / flat rack | All Vietnam ports | 4 calendar days | days 4–10 | 46 | 46 | USD |
| DEM – import reefer (container rent) | Demurrage (DEM) | Reefer | All Vietnam ports | 4 calendar days | days 12–16 | 93.3 | 133 | USD |
| DEM – import reefer (container rent) | Demurrage (DEM) | Reefer | All Vietnam ports | 4 calendar days | days 1–3 | 75.6 | 89.9 | USD |
| DEM – import reefer (container rent) | Demurrage (DEM) | Reefer | All Vietnam ports | 4 calendar days | day 17+ | 167 | 190 | USD |
| DEM – import reefer (container rent) | Demurrage (DEM) | Reefer | All Vietnam ports | 4 calendar days | days 4–11 | 84.4 | 124 | USD |
| DET – import | Detention (DET) | Dry (DC/HC) | All Vietnam ports | 3 calendar days | days 12–26 | 41.8 | 83.6 | USD |
| DET – import | Detention (DET) | Reefer | All Vietnam ports | 3 calendar days | days 12–26 | 84.4 | 124 | USD |
| DET – import | Detention (DET) | Open top / flat rack | All Vietnam ports | 3 calendar days | days 12–26 | 83.6 | 83.6 | USD |
| DET – import | Detention (DET) | Dry (DC/HC) | All Vietnam ports | 3 calendar days | days 1–4 | 14 | 28 | USD |
| DET – import | Detention (DET) | Reefer | All Vietnam ports | 3 calendar days | days 1–4 | 75.6 | 89 | USD |
| DET – import | Detention (DET) | Open top / flat rack | All Vietnam ports | 3 calendar days | days 1–4 | 28 | 28 | USD |
| DET – import | Detention (DET) | Dry (DC/HC) | All Vietnam ports | 3 calendar days | day 27+ | 57 | 114 | USD |
| DET – import | Detention (DET) | Reefer | All Vietnam ports | 3 calendar days | day 27+ | 84.4 | 124 | USD |
| DET – import | Detention (DET) | Open top / flat rack | All Vietnam ports | 3 calendar days | day 27+ | 114 | 114 | USD |
| DET – import | Detention (DET) | Dry (DC/HC) | All Vietnam ports | 3 calendar days | days 5–11 | 23 | 46 | USD |
| DET – import | Detention (DET) | Reefer | All Vietnam ports | 3 calendar days | days 5–11 | 84.4 | 124 | USD |
| DET – import | Detention (DET) | Open top / flat rack | All Vietnam ports | 3 calendar days | days 5–11 | 46 | 46 | USD |
| DEM + DET combined – export | Combined DEM + DET | Dry (DC/HC) | All Vietnam ports | 7 calendar days (incl. ETD) | days 1–3 | 14 | 28 | USD |
| DEM + DET combined – export | Combined DEM + DET | Reefer | All Vietnam ports | 7 calendar days (incl. ETD) | days 1–3 | 83.6 | 83.6 | USD |
| DEM + DET combined – export | Combined DEM + DET | Open top / flat rack | All Vietnam ports | 7 calendar days (incl. ETD) | days 1–3 | 28 | 28 | USD |
| DEM + DET combined – export | Combined DEM + DET | Dry (DC/HC) | All Vietnam ports | 7 calendar days (incl. ETD) | day 23+ | 57 | 114 | USD |
| DEM + DET combined – export | Combined DEM + DET | Reefer | All Vietnam ports | 7 calendar days (incl. ETD) | day 23+ | 83.6 | 83.6 | USD |
| DEM + DET combined – export | Combined DEM + DET | Open top / flat rack | All Vietnam ports | 7 calendar days (incl. ETD) | day 23+ | 114 | 114 | USD |
| DEM + DET combined – export | Combined DEM + DET | Dry (DC/HC) | All Vietnam ports | 7 calendar days (incl. ETD) | days 4–7 | 23 | 46 | USD |
| DEM + DET combined – export | Combined DEM + DET | Reefer | All Vietnam ports | 7 calendar days (incl. ETD) | days 4–7 | 83.6 | 83.6 | USD |
| DEM + DET combined – export | Combined DEM + DET | Open top / flat rack | All Vietnam ports | 7 calendar days (incl. ETD) | days 4–7 | 46 | 46 | USD |
| DEM + DET combined – export | Combined DEM + DET | Dry (DC/HC) | All Vietnam ports | 7 calendar days (incl. ETD) | days 8–22 | 41.8 | 83.6 | USD |
| DEM + DET combined – export | Combined DEM + DET | Reefer / OT / FR | All Vietnam ports | 7 calendar days (incl. ETD) | days 8–22 | 83.6 | 83.6 | USD |

Most surprises on Maersk local charges come from five points. Check them on the booking, not after the vessel sails.
Port of loading or discharge, container type and cargo decide which Maersk rows apply. A flat rack at Cai Mep does not pay the same as a dry box at Cat Lai.
Customs clearance, trucking, lifting and port storage are separate from the carrier’s local charges. We price them together.
We settle Maersk on your behalf and show the Maersk local charges at cost, so you see one door-to-door figure.
Exporting from Vietnam on Maersk? Our export guide covers documents and customs steps, and the Vietnam ports guide explains which terminals each service calls. The carrier’s own information is on the Maersk official website.
Comparing lines? Open the full table of local charges in Vietnam or go straight to Evergreen, RCL, Sinokor.

Tony Tuan, CEO: WhatsApp +84 909 411 668 · ceo@projectshipping.vn
Nura Tu, Overseas Department: WhatsApp +84 906 770 650 · overseas@projectshipping.vn
Calling from Vietnam: 0909 411 668
Last checked: 02 Oct 2026 · tariff effective 15 Oct 2023, 15 Mar 2025, 01 May 2026 · Maersk tariff in Vietnamese
© 2017 – 2025 Project Shipping. Design by Thiết kế Web DC